Do you need building plans for a backyard room?
Yes. The National Building Regulations and Building Standards Act says no building may be put up without the municipality's prior written approval, and a room someone lives in is never "minor building work". Check your zoning first, have the plans drawn by a registered person, and do not start building until the plans are approved.
Check your zoning first
Every property has a zoning under the municipality's land use scheme. What that zoning allows differs from one municipality to the next.
- In many municipalities a second dwelling is allowed as of right. You need only approved building plans.
- In others you need the municipality's consent first. That can mean an application, a fee and comments from the neighbours.
- Some zones limit the number of dwellings, the size of a second dwelling, or the number of people living on the property.
Take your erf number, which is on your title deed or rates account, to the municipality's town planning or land use office. Ask these questions and write down the answers:
- What is my property's zoning?
- Is a second dwelling allowed as of right, with consent, or not at all?
- What are the building lines, the coverage and the height limit?
Other limits on where you may build
- Building lines keep buildings back from the street and from the side and back boundaries. Building closer usually needs the municipality's permission, and often your neighbour's written consent.
- Coverage is the share of the property that may be under a roof.
- A servitude is a right someone else has over part of your land, such as a municipal sewer pipe along the back boundary. You usually may not build over it.
- A title deed condition is an old restriction, such as "one dwelling only". Some must be removed by an application before you build.
In a sectional title scheme or an estate, you also need written approval from the body corporate or the home owners' association.
What can happen if you build without approval
- a fine, and an order to stop the work;
- an order to demolish what was built;
- trouble when you sell, because buyers' banks and attorneys check that the buildings match the approved plans;
- trouble with insurance, because an insurer may refuse a claim for a building that was never approved;
- worst of all, a building that may simply be unsafe.
Who may draw the plans
Plans must be drawn by a person registered with the South African Council for the Architectural Profession (SACAP): an architect, an architectural technologist or an architectural draughtsperson, depending on the size of the work. Ask to see the registration, and check it on SACAP's online register.
A submission usually includes a site plan, floor plans, sections and elevations, a drainage plan, the signed application form, a copy of the title deed and the plan fees.
The approval path
- Check the zoning, building lines and title deed. Apply for consent or a relaxation first if you need one.
- Have the plans drawn by a registered person.
- Submit the plans, forms and fees. Keep the receipt and the reference number.
- Wait for approval. It can take weeks or months, so ask the municipality how long it usually takes. Do not build while you wait.
- Build to the approved plan, and call the building inspector at each stage the approval asks for.
- Get the certificate of occupancy, together with the electrical Certificate of Compliance. Only then may a tenant move in.
If the room already stands without plans
You have three choices:
- have the room measured and drawn "as built" by a registered person, submit the plans, and pay any extra fee the municipality charges for work already done;
- fix what is clearly unsafe first, then apply;
- stop using it as a home if it cannot be made safe or approved.