HybridE

QCTO qualifications › Rigger

Cover of Rigger - Knowledge Module, Volume 1

Rigger - Knowledge Module, Volume 1

Hybrid Learning Solutions · e-book

R600 incl. VAT

Printed copy: R1200 incl. VAT.

Get this e-book

Read in any web browser, or in the HybridE app on Android.

About this book

Volume 1 of the theory textbook for the QCTO Occupational Certificate: Rigger (NQF Level 4, SAQA ID 102856) — the trade, access and rope. Chapters 1 to 8 carry 70 of the knowledge component's 163 credits: the world of the rigger; shielded metal arc welding and gas cutting; tools and equipment; engineering materials, drawings and sketches, with the arithmetic of a load's mass; scaffolding, working at heights, fall protection and ladders; supervising scaffolding operations up to 6 m; inspecting access scaffolding; and ropes, knots, bends, hitches, lashings, attachments and splices. Written for both the general and the mining-sector routes. Chapters are numbered continuously 1 to 15 across the two volumes. Last date for enrolment on SAQA 102856 is 30 December 2026; last date for achievement is 30 December 2029.

What is inside

  1. Chapter 1 — The World of the Rigger
  2. PART A — THE RIGGER’S OCCUPATION (KT01)
  3. PART B — THE REGULATORY FRAMEWORK (KT02)
  4. PART C — APPLYING OCCUPATIONAL HEALTH AND SAFETY (KT03)
  5. PART D — SAFETY TRAINING FOR THE WORK AREA (KT04)
  6. Chapter 2 — Shielded Metal Arc Welding and Gas Cutting
  7. PART A — SHIELDED METAL ARC WELDING (KT01)
  8. PART B — OXY-FUEL AND PROPANE GAS CUTTING (KT02)
  9. Chapter 3 — Tools and Equipment
  10. PART A — ENGINEERING HAND TOOLS (KM-03-KT01, 22 %)
  11. PART B — ENGINEERING POWER, HYDRAULIC AND PNEUMATIC TOOLS (KM-03-KT02, 22 %)
  12. PART C — MEASURING TOOLS (KM-03-KT03, 22 %)
  13. PART D — MANUFACTURING BASIC RIGGING HAND TOOLS (KM-03-KT04, 17 %)
  14. PART E — PRODUCING SIMPLE COMPONENTS (KM-03-KT05, 17 %)
  15. Chapter 4 — Engineering Materials, Drawings and Sketches
  16. PART A — ENGINEERING MATERIALS (KM-04-KT01, 50 %)
  17. PART B — ENGINEERING DRAWINGS AND SKETCHES (KM-04-KT02, 50 %)
  18. Chapter 5 — Scaffolding, Working at Heights, Fall Protection Systems and Ladders
  19. PART A — FALL PROTECTION SYSTEMS (KM-05-KT01, 40 %)
  20. PART B — SCAFFOLDING UP TO 6 M (KM-05-KT02, 40 %)
  21. PART C — LADDERS (KM-05-KT03, 20 %)
  22. Chapter 6 — Supervising Scaffolding Operations up to 6 m
  23. PART A — BASIC ACTION PLANNING FOR SCAFFOLDING OPERATIONS (KM-06-KT01, 70 %)
  24. PART B — SUPERVISION OF ACCESS SCAFFOLDING UP TO 6 M (KM-06-KT02, 30 %)
  25. Chapter 7 — Inspecting Access Scaffolding
  26. PART A — THE INSPECTOR AND THE KINDS OF SCAFFOLD
  27. PART B — STABILITY
  28. PART C — THE DRAWING, THE LOADS AND THE INSPECTION
  29. PART D — DOCUMENTS, SIGN-OFF AND CHANGE
  30. Chapter 8 — Ropes, Knots, Bends, Hitches, Lashings, Attachments and Splices
  31. PART A — FIBRE ROPES
  32. PART B — KNOTS, BENDS, HITCHES, LASHINGS, SPLICES AND ATTACHMENTS
  33. PART C — STEEL WIRE ROPE SPECIMENS FOR DESTRUCTIVE TESTING
  34. PART D — CARE AND MAINTENANCE OF STEEL WIRE ROPES

Other Rigger titles