QCTO qualifications › Rigger

Rigger - Knowledge Module, Volume 2
Hybrid Learning Solutions · e-book
R600 incl. VAT
Printed copy: R1200 incl. VAT.
Read in any web browser, or in the HybridE app on Android.
About this book
Volume 2 of the theory textbook for the QCTO Occupational Certificate: Rigger (NQF Level 4, SAQA ID 102856) — wire rope and lifting. Chapters 9 to 15 carry 93 of the knowledge component's 163 credits: steel wire ropes; winder ropes, safety detaching hooks and sheave wheels; basic slinging and lifting, and load securing; slinging complex loads and intermediate lifting methods; lifting equipment and machines and the law that governs them; advanced lifting methods — rigging studies, tandem lifts, transfers between machines, winches, snatching and anchoring, tube bundle removal, boom conversion and tailing; and leading a rigging team and monitoring safety, health and the environment. Written for both the general and the mining-sector routes. Chapters are numbered continuously 1 to 15 across the two volumes. Last date for enrolment on SAQA 102856 is 30 December 2026; last date for achievement is 30 December 2029.
- Level: NQF Level 4
- SAQA ID: 102856
- Pages: 474
What is inside
- Chapter 9 — Steel Wire Ropes
- PART A — STEEL WIRE ROPES
- PART B — END FITTINGS
- Chapter 10 — Winder Ropes, Safety Detaching Hooks and Sheave Wheels
- PART A — WINDER ROPE EXAMINATION
- PART B — THE SAFETY DETACHING HOOK
- PART C — WINDER ROPE REPLACEMENT
- PART D — THE BACK-END OF A WINDER ROPE
- PART E — THE FRONT-END RESIN-POURED SOCKET
- PART F — THE SHEAVE WHEEL
- Chapter 11 — Basic Slinging and Lifting, and Load Securing Operations
- PART A — SLINGING REGULAR LOADS UP TO 3 t
- PART B — MANUAL LIFTING EQUIPMENT AND TACKLE
- PART C — LIFTING OPERATIONS USING MANUAL LIFTING EQUIPMENT AND TACKLE
- PART D — DIRECTING CRANE OPERATIONS
- PART E — SECURING LOADS FOR TRANSPORTATION
- PART F — PLACING AND MOVING A LOAD USING ROLLERS AND SLIDERS
- Chapter 12 — Slinging Complex Loads and Intermediate Lifting Methods
- PART A — SLINGING COMPLEX LOADS
- PART B — LIFTING, MOVING AND MANOEUVRING LOADS WITH MECHANICAL LIFTING EQUIPMENT
- PART C — LIFTING LOADS USING THE FLOATING METHOD
- PART D — LIFTING AND TURNING A LOAD
- PART E — GUIDING THE LIFTING AND POSITIONING OF LOADS
- PART F — LIFTING LOADS USING THE PICK AND CARRY METHOD
- PART G — RE-RAILING RAIL-BOUND EQUIPMENT
- PART H — LIFTING LOADS USING TEMPORARY CONSTRUCTION LIFTING METHODS
- Chapter 13 — Lifting Equipment and Machines
- PART A — THE LEGISLATIVE FRAMEWORK
- PART B — MOBILE AND OPERATOR-CONTROLLED LIFTING MACHINES
- PART C — INSPECTION AND MAINTENANCE PROCEDURES
- Chapter 14 — Advanced Lifting Methods
- PART A — RIGGING STUDIES (KM-14-KT01, 12 %)
- PART B — TANDEM LIFTING (KM-14-KT02, 11 %)
- PART C — TRANSFERRING LOADS BETWEEN LIFTING EQUIPMENT (KM-14-KT03, 11 %)
- PART D — LIFTING AND MOVING A COMPLEX LOAD WITH A WINCH (KM-14-KT04, 11 %)
- PART E — TRANSFERRING A LOAD BY SNATCHING AND ANCHORING (KM-14-KT05, 11 %)
- PART F — SUPERVISING ADVANCED MOBILE CRANE OPERATIONS (KM-14-KT06, 11 %)
- PART G — TUBE BUNDLE REMOVAL (KM-14-KT07, 11 %)
- PART H — BOOM CONVERSION (KM-14-KT08, 11 %)
- PART I — TAILING A LOAD (KM-14-KT09, 11 %)
- Chapter 15 — Management-Related Activities
- PART A — LEADING A TEAM IN A RIGGER’S ENVIRONMENT
- PART B — MONITORING THE APPLICATION OF SAFETY, HEALTH AND ENVIRONMENTAL PROTECTION PROCEDURES